Skip to content
Menu
Konrad News – The news site
  • About
  • Affiliate Disclosure
  • Contact
  • Privacy Policy
Konrad News – The news site

Redevelopment of Shinagawa Station West Exit (Takanawa 3-chome), Seibu Real Estate’s building complex is scheduled to begin construction in FY2028. Hotel and the largest MICE facility in the district.

Posted on February 4, 2026 by Editor in Chief

On December 22, Seibu Real Estate announced that the Tokyo Metropolitan Government has notified Seibu Real Estate of a change in the urban plan for the B-1 district, which is being promoted in conjunction with Keihin Electric Express Railway, Takanawa 3-chome Shinagawa Ekimae Urban Area Redevelopment Association, Urban Renaissance Agency, and Tokyu Land Corporation, to define a district for redevelopment promotion in the Shinagawa Station West Exit District.

The redevelopment consists of four districts: District A (scheduled to open in 2029), District B (scheduled to open in 2032), District C (scheduled to open in 2028), and District D (scheduled to open in 2030). Construction of District A, which is being promoted by Keihin Electric Express Railway and Toyota Motor Corporation, began on May 31, while construction of Districts C and D is scheduled to begin in FY2026.

Construction of the B-1 district, which will be led by Seibu Real Estate, is scheduled to begin in FY2028, with “Takanawa Forest Park” in the B-1-1 district (approximately 0.9 hectares) and a complex building with 4 underground floors and 31 floors above ground in the B-1-2 district (approximately 3.0 hectares). The site area is approximately 27,500 m2, the floor area ratio is approximately 740%, and the height is approximately 140 m.

The building will include offices, a hotel, and residences, as well as a commercial area and MICE facilities representing the Shinagawa Station West Exit area. In addition, a barrier-free pedestrian walkway will be constructed, extending the flow line in District A, which is closest to Shinagawa Station.

For more information on the progress of the development plan and other details, please check the website “Shinagawa Station West Exit Area Urban Development”.

read more

© Source travel watch

Uncategorized

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • ANA to Make the Parent Companies of AIRDO and Solaseed Air Wholly-Owned Subsidiaries; Strengthening Domestic Flight Network with Brand Integration in Mind
  • New Disney “Wreck-It Ralph” Attraction: DPA Price Set at 3,000 Yen; Opening in April 2027
  • Highway Discount: “Shift Your Trip for Winter Savings! Kan-Etsu Leisure Pass.” Earn up to 20% in mileage points by avoiding peak traffic times.
  • Kärcher Launches Nationwide Sales of the “SC 1 Multi” Handheld Steam Cleaner. Removes Stubborn Stains Using Only Water
  • The “Suica Penguin” Fan Appreciation Event finally kicks off tomorrow. At Ueno Station, numbered tickets will be distributed starting with the first train, and there will also be photo spots.

Recent Comments

No comments to show.

Archives

  • October 2026
  • September 2026
  • August 2026
  • July 2026
  • June 2026
  • May 2026
  • April 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022

Categories

  • Japan
  • JICA contributions
  • travelling
  • Uncategorized
©2026 Konrad News – The news site | Powered by Superb Themes
Go to mobile version