JR East will suspend rapid service between Omiya and Ofuna Stations on the Keihin-Tohoku/Negishi Line due to maintenance work and construction during daytime hours. The period is from 10:30 a.m. to 3:30 p.m. on May 19, 20, and 21.
During the construction work, only the Keihin Tohoku Line between Tabata and Ueno, Tokyo and Tamachi will use the Yamanote Line tracks, with trains stopping at each station. The number of trains on both the Keihin-Tohoku and Yamanote lines will be the same as usual, and no substitute transportation will be provided.
Please check the JR East application and website for the operating time (timetable) on the day of construction.
© Source travel watch